This Grand Junction Regional Airport Authority project at Walker Field Airport included the reconstruction of the general aviation apron in four separate phases. The project consisted of the removal of the existing deteriorated 20,000sy of asphalt and 46,000sy of concrete apron and repaving with concrete. In addition, the project included 1,500lf of trench drain with storm sewer and inlets.