This City of Boulder project installed pedestrian, bicycle, transit stop and vehicular improvements along and adjacent to 30th Street in Boulder. The project included bike lanes on 30th Street from Arapahoe Avenue to Pearl Street, new bridge and pedestrian/bicycle underpass on 30th Street at Boulder Left Hand and North Boulder Farmer’s ditch (just south of Pearl Street), multi-use path connection between the east side of 30th Street and Goose Creek Greenway (the path connection on the west side already exists), mid-block pedestrian crossings on 30th Street between Canyon Boulevard and Walnut Street and between Pearl Street and Goose Creek Greenway, an additional left turn lane for northbound 30th Street at Pearl Street, a 10-foot wide sidewalk on the east side of 30th Street from Arapahoe Avenue to Walnut Street, and transit stop amenities and urban street-scape improvements.
- Antonito CO – US Highway 285 Municipal Streets Reconstruction
- Castle Rock CO – SH 86 – I-25 to Woodlands Boulevard Reconstruction
- Boulder CO – North Pearl Parkway Multi Use Path Reconstruction
- Wheat Ridge CO – Youngfield and 32nd Street Improvements
- Cokeville WY – US Highway 30 Concrete Overlay
- Boulder CO – Broadway Street (Euclid to 18th) Transportation Improvements Project
- Denver CO – Tennyson Street
- Denver CO – Reconstruction South Broadway Street (Arizona to Iowa Avenues)
- Denver CO – 14th Street Sidewalk and Streetscape Project
- Boulder CO – 30th Street Transportation Improvements Project
- Gillette WY – Douglas County Highway 59
- Glenwood Springs CO – Glenwood Canyon